No. 26, Spring 2007

Design Phase Begins at Keeper’s House
Harlem River Map and Guide, by Shorewalkers
The Long Shadow of the Croton – Part 2, by Christopher R. Tompkins [about John Tompkins, Croton Reservoir Gatehouse Superintendent, including photo of Croton Dam spillway without water, 1907]
High Bridge: Reusing Historic Infrastructure
Memo to Trail Neighbors: A Good Year for Conservation Easements
Management of Hazardous Trees on the Aqueduct, by Peter Iskenderian, state park manager
Additional images: Brian Goodman with High Bridge Poster, p. 7; concept drawing of Keeper’s House, p. 8

PDF icon DOWNLOAD (11.9 MB)